SC200/200LA 500M CZPT CZPT
CZPTdata(OEM)
Product Sort | Design | Lifting Velocity(m/min) | Max Height(m) | Travel Unit | Protection System | Electronic Handle Systerm |
Direct driving PLC | SC100/a hundred | 33 m/min | 150m | 2*11KW | SAJ30-one.two | PLC |
SC150/one hundred fifty | 33 m/min | 150m | 2*15KW | SAJ40-1.two | PLC | |
SC200/200 | 33 m/min | 150m | three*11KW | SAJ40-1.2 | PLC | |
Lower Pace VFD | SC100/100L | -40 m/min | 250m | two*11KW | SAJ40-one.2 | 30KW VFD |
SC150/150L | -forty m/min | 250m | 2*13KW | SAJ40-1.two | 30KW VFD | |
SC200/200LA | -33 m/min | 250m | 2*13KW | SAJ40-1.2 | 30KW VFD | |
SC200/200LB | -forty m/min | 250m | 2*15KW | SAJ40-1.two | 37KW VFD | |
SC200/200LC | -forty six m/min | 250m | 3*11KW | SAJ40-1.two | 37KW VFD | |
Mid Speed VFD | SC200/200MA | -fifty five m/min | 350m | 2*19KW | SAJ40-1.four | 45KW VFD |
SC200/200MB | -sixty m/min | 350m | two*23KW | SAJ40-1.4 | 55KW VFD | |
SC200/200MC | -63 m/min | 350m | three*15KW | SAJ50-1.four | 55KW VFD | |
SC200/200MD | -72 m/min | 350m | three*19KW | SAJ50-one.6 | 75KW VFD | |
High Speed VFD | SC200/200HA | -80 m/min | 450m | 3*23KW | SAJ50-one.six | 75KW VFD |
SC200/200HB | -ninety m/min | 450m | 3*26KW | SAJ50-two. | 90KW VFD | |
SC200/200HC | -100 m/min | 450m | 3*32KW | SAJ50-two. | 110KW VFD | |
SC200/200HD | -one hundred twenty m/min | 550m | 3*19KW | SAJ50-two.four | 75KW VFD |
Solution Information:
A. Creation procedure:Rigorous substance selection- blanking- inspection – welding-inspection- Blasting – inspection -Baking completed or galvanized- inspection -Concluded merchandise
Special design for cage:
1. bottom and roof of Cage adopt trapezoidal frame
2. Base and the roof are full symmetry
three. The aircraft of symmetry are connected by Bending plate, Bending channel and square pipe which make it firm, straight and harmony in use.
four. The wall around cage can be fastened by Punched Aluminium plate, Punched zinc plate, steel wire mesh.
5. Surface Therapy: Blasting, Baking concluded,Galvanized
B:About the mast section
1. Steel plates are bented of U-form to strengthen the mast part. |
2. Mast segment with galvanized coat or heat spray coat can be decided on. |
3. Large quality metal plate Q345B bended by unique equipment: Thickness 4.5mm. |
four. Welded steel tube Q345B and seamless steel tube 20# are also CZPT: Ø76*4.5mm or Ø89*4.5mm (Thickness of 6mm or 8mm is also CZPT). |
five. 650*650*1508mm is the most typical measurement suits for customers. Other product of mast part can decide on: 450*450*1508mm, 650*900*1508mm,800*800*1508mm |
About us:
Right after-sale services
1.Top quality Assurance:
Good high quality is certain by sophisticated manufacturing engineering.and all goods will be checked by our quality-control supervisor. |
2.Excellent Package: We offer regular,robust,protective bundle for our products to prevent is from outer injury. |
3.Quickly Reaction: Detailed details,distinct design and cost of cost of goods will be presented speedily right after receiving your inquiry. |
Welcome to pay a visit to our factory!
Any queries,Remember to come to feel free to speak to me!